In Chongqing, the delivery and acceptance inspection for an upgrade of emergency rescue capabilities was successfully completed. Huimingjie fulfilled its commitment by delivering its illumination UAV and flow measurement UAV to a local organization in Chongqing. This not only marked a key milestone in the cooperation between the two sides, but also signaled a new era of efficient operations in emergency rescue.
Traditional lighting equipment is often limited in large-scale disaster response and remote accident sites, with restricted light coverage, complicated transportation and deployment, and delays that may cost valuable rescue time. Huimingjie’s illumination UAV is equipped with an ultra-bright light source and can take off with one click, instantly illuminating rescue areas covering several square kilometers and providing clear visibility for rubble search, mountain rescue, and other operations. With stable low-altitude hovering, strong wind resistance, and continuous illumination time several times longer than conventional equipment, it brings great convenience to rescue operations.
Traditional water flow measurement often requires personnel to approach dangerous waters, where rapid currents, undercurrents, and whirlpools may threaten the safety of rescue workers at any time. The flow measurement UAV serves as a powerful tool for water rescue. Equipped with an advanced flow velocity measurement device and an HD camera, it can accurately capture water flow speed and water level changes through simple operation, while transmitting data back to the command center in real time. It enables efficient data transmission within a short period and provides all-round protection for rescue personnel.
On the day of delivery and acceptance inspection, team members from the Chongqing organization conducted a comprehensive performance evaluation of the UAVs. During practical operation, the UAVs demonstrated lightweight and flexible flight, precise hovering, smooth control, and excellent performance across all functions. After rigorous testing, all indicators fully met the requirements, and the systems successfully passed acceptance inspection.



.jpg)
.jpg)



